The third and final 228-tonne abnormal load made the journey through Suffolk, leading to the closure of the A140 today.
Suffolk Highways have been transporting the load from Ipswich Docks since 5.30am.
It took over four hours to clear the town and reach the A14, which had a rolling roadblock in place to help with traffic flow.
A decision was made to continue the load's journey to Eye Airfield.
READ MORE: Live updates as third abnormal load moves through Suffolk
The A140 was closed from the Needham Market A14 exit to the turn-off for Eye Airfield.
A temporary over-bridge was installed in Brockford to help the load along and to protect the road surface.
The A140 is now clear and traffic can move freely.
Comments: Our rules
We want our comments to be a lively and valuable part of our community - a place where readers can debate and engage with the most important local issues. The ability to comment on our stories is a privilege, not a right, however, and that privilege may be withdrawn if it is abused or misused.
Please report any comments that break our rules.
Read the rules here